5 Factors To Consider When Building A New Aggregate Plant

January 9, 2019
在设计骨料工厂之前,考虑这五个因素可以帮助您确定适合您网站的最佳解决方案.

在确定要在现场安装的加工厂类型时, 您想要的配置,将为您提供最高质量的菠菜网最稳定正规平台_最全菠菜网大全与最快的投资回报率. 在设计新的骨料厂时,这里有一些需要考虑的因素.

1. Prove deposit size and uniformity

探明储量对于采矿作业的准确估价是很重要的. 最准确的ROI计算是基于整个储层的综合钻井数据. This is common sense to some and overkill to others, but knowledge of the depth, 矿床的大小和矿物组成为投资者提供了信心,并为您的矿山规划提供了洞察力. 根据不同矿床的大小和均匀性,所需钻孔的数量和位置可能有很大差异, so it is important to consult experts in the field during this process. Once this data is gathered, McLanahan在计算运行和维护设备的成本方面提供帮助,以便满足或超过您的盈利预期.

Crushed-Rock-Featured-Aggregates-Industry.jpg?mtime=20180717153809#asset:3315

对矿床进行适当估价的一个潜在优势是确定除主要总产物外的潜在副菠菜网最稳定正规平台_最全菠菜网大全. 这些可能是更高价值的矿物,或者只是一个可能被浪费的尺寸分数. 在地质学家的帮助下,确定矿床中的全部矿物是使矿区利润最大化的最佳途径.

2. Design a flexible processing plant

McLanahan收到的大多数查询都包括单个feed分级,或者根本没有. Final designs should of course be based on run-of-mine feed, 但是在设计系统时,考虑到潜在输入的整个广度是很重要的. 应分析来自已探明储量的钻孔数据,并(扣除覆盖层)在考虑矿井进料运行的同时,考虑最佳和最差进料. 这种比较允许选择能够处理任何你扔给它的设备. 它还可以深入了解矿井各个部分的生产率变化情况.

In sand deposits, 饲料等级可以在Excel电子表格中进行比较,其中一个标准分布偏离平均值显示为预期饲料,两个标准分布偏离平均值显示为不常见饲料. 这将显示系统中可能存在的瓶颈,并允许在工厂投入使用之前将其中一些瓶颈设计出来. 

3. Plan for future expansion

大多数骨料生产商把他们的加工厂推到崩溃点,然后退到足够的程度,以防止持续的崩溃. 在系统中应该存在瓶颈的前端进行规划,将使未来的扩展更加负担得起,同时控制初始成本. Site layout is the most critical part of this planning. 更换几件设备要比重新安排整个系统容易得多. 获得比最初要求更高的进给量的投标可能会表明,一些设备的容量增加了一倍,而价格仅增加了20%. 在最初的建造过程中,增大设备和输送机的尺寸可以在将来增加扩建时节省大量资金. 

4. Schedule maintenance downtime

Clock

没有人想在一切顺利的时候停止工作,但这总是最好的时间. 很容易落后于计划,并推迟维护,直到出现问题, 但经验告诉我们,这样做总是代价更大,时间利用效率更低. 意外停机可能意味着需要花费数小时的时间挖掘输送机和设备,或更换本不应出现磨损的部件. 根据制造商估计的水平来规划设备运行时间,以便定期维护,更换易损件,而不是更换设备的钢体或结构中的梁. 对磨损模式的分析还可以让我们了解下一步需要更换哪些部件. Long lead time items may then be ordered preemptively, reducing downtime and further improving system uptime. Unplanned shutdowns may still happen, but they are much less likely if proper care is taken of the system.

5. Consider all tailings management options

随着水资源的减少和环境问题的增加, 不假思索地将工厂尾矿倒入池塘的日子即将结束. In some parts of this country, we are well past that point. In others, we are only just beginning to consider it. Regardless of where you are, tailings management solutions 在过去的20年里取得了长足的进步,现在可以高效可靠地消除沉淀池了吗. Many aggregate operations are adding fines recovery systems, Thickeners and Filter Presses (或三者的结合)以降低成本和/或生产可销售的菠菜网最稳定正规平台_最全菠菜网大全. It is prudent to consider these options during the initial plant design.

Tailings-Management-Featured.JPG?mtime=20180626111320#asset:3423

罚款回收系统可以显著减少送到池塘的罚款数量. This can cut cleanout costs in half and may provide a sellable product, but these results vary based on the deposit, so testing is critical. 下一步是回收工艺用水,并将尾矿中的固体物质稠化,以大大减小池的大小,并为洗选厂提供工艺用水, saving horsepower on water pumps. 最后一步是把变稠的固体压成蛋糕. This allows for the complete elimination of settling ponds, opening up land for mining, eliminating costs of cleaning out those ponds and, sometimes, adding a sellable product.

如果您需要帮助确定您的新骨料厂的最佳解决方案, McLanahan can help.

Email Us Now
Tags: Crushing, Dewatering, Fines Recovery, Feeding, Screening/Sizing, Scrubbing, Washing & Classifying

Need Some Help?

Our customer service team is here to help you 24/7. 我们可以为您运送零件,派遣现场服务技术人员到您的现场,并回答您的任何问题. Whatever you need, we are here for you.